Search

Applied solutions

Pumping station

 

Pumping station parameters:

 

  • flow [Q] = 1.38 l / s
  • lifting height = 4.25 [m]

Hydraulic system:

 

  • submersible pump IS 50 T (CAT.NO. A414-050-0004-06) P1 / P2 = 0.495 / 0.37 kW, In = 0.9 A – 2 pcs.
  • piping DN 50 made of steel 1.4301, connected on flanges (PN = 10 stainless steel)

Elements:

 

  • soft-sealed valve DN 50– 2 pcs.
  • ball check valve DN 50 – 2 pcs.
  • parallel operation of pumps, technological sewage
  • EU control cabinet, mounted on the tank cover. Equipped with, among others with SG / 25S / 0-4 / L = 10m hydrostatic probe + SG type handle, 2 floats. Optical and acoustic signaling of emergency states.

Concrete chamber:

 

  • diameter 1500 mm
  • height h = 4.9 m

Applied solutions

EPS pumping station

 

Pumping station parameters:

 

  • flow [Q] = 701.00 l/s
  • lifting height = 8.60 [m]

Hydraulic system:

 

  • submersible pump XFP 305J-CB2.377 PE 370/6 P1 / P2 = 39.74 / 37.0 kW, In = 70.0 A – 2 pcs.
  • piping DN 400 made of steel 1.4301, connected on flanges (PN = 10 stainless steel)

Elements:

 

  • soft-sealed valve DN 400– 2 pcs.
  • ball check valve DN 400 – 2 pcs.
  • parallel pump operation, rainwater sewage
  • EU control cabinet, mounted on the tank cover. Equipped with, among others with SG / 250 / O-4 / L = 18 m hydrostatic probe + SG type handle, 2 floats. Optical-acoustic signaling of emergency states, with the possibility of disconnecting an acoustic signal, sending alarm messages (SMS) to mobile phones.

Concrete chamber::

 

  • diameter = 6000 mm
  • height h = 8.25 m

Applied solutions

The value of the investment, which lasted about 1 year, is  5 457 404 PLN. The contract was carried out by the Technological Execution Department of the Ecol-Serwis Division.

 

The investment of reconstruction of the pumping station was implemented by the Mrągowo Commune with the participation of EU funds under the project: “Modernization and expansion of sewage and water supply systems of the Mrągowo agglomeration under measure 2.3” Water and sewage management in agglomerations “priority axis II” Environmental protection, including adaptation to climate change “Operational Program Infrastructure and Environment 2014 – 2020.”

As part of the task, works related to the assembly of modern technological, electrical and I&C installations were completed. The works also included the delivery and assembly of pumps with a capacity of Q = 450 m3/h and a power of P = 75 kW and pipelines made of AISI 316L steel, construction of a ventilation and heating system based on heating and ventilation units.

 

A video monitoring system with an alarm system and data transmission was also installed. The pumping station serves the entire city of Mrągowo, therefore all works were carried out with the uninterrupted operation of the pumping station using emergency systems. All technological and sanitary works were carried out without the participation of subcontractors. Installation capacity H = 125 l/s, H = 56 m.

Applied solutions

  • renovation of the metal body (sandblasting, painting),
  • replacement of the entire facility equipment,
  • flowmeter chamber has been added,
  • connecting the facility to the monitoring system.

Applied solutions

The system includes:

 

  • 6 groups of tanks – 1720 m 3 in total, all with similar equipment
    and metering
  • valve with electric drive and radar water level measurement,
  • 2 valves (supply and emptying of tanks) with electric drives,
  • separator with a bypass and a tank for oil derivatives,
  • hydrant feed pump,
  • meter of water quality and conductivity
  • water level sensors in tanks

The scope of work included:

 

  1. Development of a local precipitation model, local reference hyetograms and computer hydrodynamic models.
  2. Development of complete project documentation and obtaining the necessary arrangements, decisions, permits for the performance of the contract.
  3. Delivery and installation of the Bumerang Smart software along with the necessary equipment for its operation, controlling water retention rainfall:
     

    • electrically controlled drives on gate valves
    • quality monitoring of retained rainwater
    • network controlled valves
    • monitoring of the filling of the cross-sections of the rainwater drainage system below the tanks
    • installation of a rain gauge and a weather forecast monitoring subsystem
  4. Execution of construction works
  5. System implementation and user training
  6. The system will control and optimize the operation of the retention reservoirs installed along the existing storm sewage collectors using the latest weather data and specially created models hydrodynamics.

Project details

Works on the construction of the Bar-Boljare highway (169.2 km) officially started on May 11, 2015. The construction of the priority section Smokovac – Uvač – Mateševo ​​was planned for four years. According to official information, the contractor was to complete the construction of a 41-kilometer section with 45 bridges and flyovers and 32 tunnels within 48 months. More information about the project can be found here more.

Our partner from Bosnia and Herzegovina – manufacturer of concrete products BINIS, supplied for the aforementioned project approximately 30 coalescence separators with a nominal flow of 40 to 150 l/s using technological equipment from Ecol-Unicon, among various road construction products of their own production. We are very proud to cooperate with such a partner and to have an opportunity to use our products in such huge projects.

 

Scope of delivery: 30 coalescence separators (including separators with bypass), nominal flow from 40 to 150 l/s, manufacturer of the ESK and ESK-BII technological equipment for separators- Ecol-Unicon, manufacturer of concrete chambers – Binis, Bosnia and Herzegovina.

Within the next few weeks, the brand new settling tanks and separators will be installed and run into operation. Using our separators guarantees the highest treatment level thanks to the full compliance with the EN-858 norm. Ecol-Unicon first-class separators will ensure at least 5 mg/l at the outlet even for extremely high flows.

We are pleased to supply the highest quality equipment together with Byggros. It more than just about the environment, clean water is our common future. This is our way to make this World a better place.

Applied solutions

FC055SFR – Horizontal settling tank EOS 2500/10

Internal diameter Dw [mm]= 2500
Active capacity Vcz [m3]= 10
Concrete class: XC4, XA1, XF1, XD3, XS3

 

 

FC0001OUR – High efficiency lamella separator with cover at outflow section – ESL-Z 60/600

Chamber DN 2000
Nominal flow (NS) [dm3/s]= 60
Maximal flow [dm3/s]= 600
Oil storage volume [dm3]= 1200
Sedimentary section storage volume [dm3]= 550
Concrete class: XC4, XA1, XF1, XD3, XS3

FC00616R Sample well

Chamber with internal diameter Dw [mm]= 1200

 

FC051SFR – Horizontal settling tank EOS 3000/16

Internal diameter Dw [mm]= 3000
Active capacity Vcz [m3]= 16
Concrete class: XC4, XA1, XF1, XD3, XS3

 

FC015OUR – High efficiency lamella separator with cover at outflow section – ESL-Z 90/900 S

Chamber DN 2500
Nominal flow (NS) [dm3/s]= 60
Maximal flow [dm3/s]= 600
Oil storage volume [dm3]= 1950
Sedimentary section storage volume [dm3]= 790
Concrete class: XC4, XA1, XF1, XD3, XS3

 

FC0332R – Sample well

Chamber with internal diameter Dw [mm]= 1200
Concrete class: XC4, XA1, XF1, XD3, XS3